Procurement policy note (PPN) 03/23 replaces Procurement policy note (PPN) 08/16)
The Cabinet Office has just issued long-awaited procurement policy note (PPN) 03/23. This revised PPN is particularly important because it allows public sector procurers to specify the Common Assessment Standard (CAS) for substantial public works. As a result, the PPN greatly increases both the scope and type of buyer who will require suppliers to undergo CAS pre-qualification questions (PQQs) before tendering for construction or maintenance work.
PPN 03/23 finally adopts a recommendation in the 2021 report Constructing the Gold Standard — an independent review of public sector construction frameworks by the Centre of Construction Law at King’s College, London. The King’s College review highlighted how the CAS can prevent suppliers from having to answer numerous unexpected or redundant questions to meet public sector requirements.
The revised PPN finally recognises the CAS, which is based on an industry-supported, standard question set. CAS questions cover a range of buyer assurance enquiries in key areas such as financial, insurance, H,S&E (including carbon) and quality management, along with employment and social responsibility. Suppliers’ responses to the CAS are assessed by four recognised assessor bodies, including ECA industry partner CHAS.
Until now, the CAS - developed by Build UK and supported by many other industry stakeholders including ECA - has made most progress with a growing number of Tier 1 construction buyers. However, with the notable exception of the NHS, the revised PPN requires the use of the CAS or PAS 91 for substantial construction and other public works PQQs. In practice, its’ anticipated that public sector buyers will increasingly opt for the CAS as their PQ of choice.
Contents |
[edit] What about PAS 91?
BSI’s PAS 91 was created back in 2010 as a stakeholder response to the unbridled proliferation of construction (and particularly health and safety) PQQs. It was a ground breaker and the bedrock of more recent efforts, particularly via the CAS, to tackle the problem. Even so, it’s public procurement days, though not quite over, look numbered. Generally, the CAS offers the public sector with a more useful way forward for PQQs, notably its relative ability to adjust to legislative change and other industry assurance requirements. For example, the CAS Review Group is positioning itself to draft practically useful PQQs about the forthcoming Building Safety regime - a task that would be beyond the PAS 91 revision cycle.
[edit] Help at hand
Public sector specification has been one of the most sought-after developments to support deployment of the CAS across construction and maintenance. The revised PPN underlines that the CAS isn’t just fit for prequalifying suppliers for new build projects, but also for those who operate across maintenance and other contractor services.
ECA Members looking to engage with the CAS have free access to the highly regarded ECA ‘CAS Manual’ (which provides useful information and supporting documents on a wide range of CAS questions) and ECA’s expert advisory teams.
This article appears on the ECA blog site as "Public sector PQQs look to the CAS" dated April 5, 2023. It was written by Paul Reeve ECA’s Director of CSR, Chair of the Build UK CAS Review Group and Vice-Chair of the PQ Cross Industry Body.
--ECA
[edit] Related articles on Designing Buildings
- Appointing consultants.
- Achieving Excellence.
- CAS answers an expensive problem for industry.
- Collaborative practices.
- Common minimum standards.
- Competitive procedure with negotiation.
- Constructionline.
- Construction contract.
- Crown Commercial Service CCS.
- Efficiency and Reform Group.
- Expression of interest.
- Government construction strategy.
- Invitation to tender.
- Major Projects Authority.
- Mid tender interview.
- OJEU.
- PAS 91.
- Pre-qualification standard 2021.
- Pre tender interview.
- Procurement route.
- Prime cost contract.
- Private finance initiative.
- Procurement policy note PPN.
- Project lifecycle for major road projects.
- Public private partnership.
- Public sector PQQs look to the Common Assessment Standard.
- Selection criteria.
- Small and medium-sized enterprises.
- Tender.
- Tender documentation.
- Tender evaluation.
- Tender processes.
- The benefits of e-procurement in construction.
- The common assessment standard.
[edit] External links
www.gov.uk/government/publications/ppn-0323-standard-selection-questionnaire-sq
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
Comments
[edit] o make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.